Most shower remodels can be completed in two to three days, depending on your project’s scope and materials. Smaller upgrades with standard acrylic surrounds and fixtures are typically the fastest. Custom designs that include tile work, seating, or layout changes require additional time for precision installation.

Here are some factors that can influence your shower remodel timeline:

  • Project scope: Full remodel vs. fixture and surround replacement.
  • Materials: Acrylic systems install faster than custom tile or stone.
  • Plumbing work: Relocating pipes or drains adds time.
  • Customization: Built-in seating or niche shelving requires added finishing steps.

 

CareFree Home Pros manages your project from start to finish to minimize disruption while maintaining quality craftsmanship and attention to detail.